There will be a crane located on Cross Campus Drive near the Glen Towers on Wednesday, June 6 from 6:00 am – late afternoon. The crane will be lifting new elevator equipment on to the Glen Tower roofs. There will be a partial road closure on Cross Campus Drive. A signal crew will be on site to direct traffic. During this time access to all Glen Towers will be very limited.
Crane Operation on Cross Campus Drive
About Carol Wettersten
Subscribe
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)