Problems with the Glen Bridge were discovered during a recent routine inspection. After further investigation it was decided that the safest and ultimately most cost-effective option is replacing the bridge instead of repairing it. Currently, the new bridge is expected to be completed by spring 2017.
Construction Update: Glen Bridge
About Tyler New
Subscribe
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)