The Glen Pedestrian Bridge will be closed from noon on November 29 through 7 a.m. on November 30 for the application of a sealer on the concrete. However, if it rains within this time frame, the work will be re-scheduled to take place from noon on November 30 till 7 a.m. on December 1. The sidewalk […]
Tag Archives | Glen Bridge
Construction update: Glen Bridge closure today
The Glen Pedestrian Bridge will be closed from noon on today through 7 a.m. tomorrow, October 31 for the application of a sealer on the concrete. The sidewalk and wooden pathway located in the loading dock area behind Glen Dining Hall and Glen Tower B can be utilized as a detour during this period. For […]
Construction update: Glen Bridge closure
The Glen Pedestrian Bridge will be closed from noon on October 30 through 7 a.m. on October 31 for the application of a sealer on the concrete. The sidewalk and wooden pathway located in the loading dock area behind Glen Dining Hall and Glen Tower B can be utilized as a detour during this period. […]
Construction Updates
Updates and upcoming milestones for active TU construction projects are listed below. For more information, visit the TU construction page. Burdick Hall Expansion The interior construction for the Burdick Hall is ongoing, and the renovated building is scheduled to be opened by late fall 2017. Burdick Hall remains open and is accessible through the entrance […]
Construction Update: Glen pedestrian bridge pathway closures
The Glen pedestrian bridge will be removed for demolition on July 5. Portions of the pathways near the Glen pedestrian bridge between Smith Hall and the Union will be closed to pedestrian access while the demolition occurs on that day. Fencing and detour signs will be provided showing the areas closed to pedestrians. If you have […]
Construction Update: Glen Arboretum trail closure
The Glen pedestrian bridge is being replaced, starting on June 26 and will be completed by August 25. During this time, the portion of the Glen Arboretum trail near the Union will be closed to pedestrian access while the work occurs. If you have any questions, please contact Alex Clark at 4-2717.
Construction Update: Glen Bridge
Problems with the Glen Bridge were discovered during a recent routine inspection. After further investigation it was decided that the safest and ultimately most cost-effective option is replacing the bridge instead of repairing it. Currently, the new bridge is expected to be completed by spring 2017.
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)