TU home | T3 | Renovations Coming to Cook Library This Spring

Renovations Coming to Cook Library This Spring

In order to better meet the research needs our students, faculty, and staff, Cook Library will undergo some renovations in the coming months.

Phase 1A of the renovations has begun and we expect the following changes to be completed before fall 2016:

  • The leisure reading collection has moved to the 2nd floor
  • The microfiche cabinets are moving to the middle of the 2nd floor
  • A new 40-seat library instruction classroom will be opened in the former microfiche area on the 2nd floor
  • Circulation and Interlibrary Loan services will be relocated to the right side of the 3rd floor
  • Starbucks will be expanded and a new 24/7 Study Zone will be constructed between Starbucks and the Learning Commons

We apologize for any disruptions that this construction might cause. If you need a quieter area to study, please try the Quiet Room (200C) at the back of the 2nd floor or the 4th or 5th floor. You also can obtain a pair of earplugs at the Research Help Desk on the 3rd floor.

For updates, visit Cook Library’s website and social media (Facebook, Instagram, and Twitter)