Asphalt work will be taking place July 1st -4th on the sidewalk areas located between Van Bokkelen, Stephens Annex, and Stephens Hall. Existing sidewalks will be re-paved in order to improve drainage. Please excuse any inconvenience this may cause during this time. Refer any questions to Paul Thomas at 410-704-2483 or pthomas@towson.edu Thank you.
Sidewalk Asphalt Work
About Carol Wettersten
Subscribe
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)