The ramp that extends from the Lecture Hall to Hawkins Hall and the Psychology Building will be deconstructed beginning on or around July 1. As a result, the following conditions will exist:

? The brick walkway between Linthicum Hall and Psychology buildings will be closed to all pedestrian traffic.
? Most of the brick plaza will be closed off in the general vicinity of the Lecture Hall ramp. A portion of the plaza will be maintained for pedestrian travel between Linthicum Hall, the south entrance of Hawkins Hall and the Union.
? The main plaza entrance to Hawkins Hall will be blocked off and only available for emergency use. The south plaza entrance to Hawkins Hall will remain in operation.
? The plaza entrance to the Psychology Building will be blocked off and only available for emergency use. All other doors will remain in operation.
? Internal connections between Hawkins Hall and the Psychology Building will be blocked off from 5:30 a.m. to 3:30 p.m. weekdays for the duration of the work.

If you have questions about this project, please contact Scott Guckert at {sguckert@towson.edu}.