There will be a crane located on Cross Campus Drive near the Glen Towers on Wednesday, June 6 from 6:00 am – late afternoon. The crane will be lifting new elevator equipment on to the Glen Tower roofs. During this time access to all Glen Towers will be very limited.
Crane Operation on Cross Campus Drive
About Carol Wettersten
Subscribe
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)