The York Road vehicular entrance to the Glen Parking Garage will be closed for cross walk striping from 9 a.m. to 10 a.m. on Sunday December 3, 2017. Access to the garage will only be from Cross Campus Drive during this time. Bill Bateman’s front parking lot will remain accessible. Please plan accordingly.
Construction update: vehicular entrance to Glen Garage closed on Sunday
About Simi Akinmuda
Subscribe
Related Posts:
- SABBATICAL TALK: Conducting and Publishing Research In Physics and Astronomy with Undergraduates
- SABBATICAL TALK: Conducting and Publishing Research In Physics and Astronomy with Undergraduates
- Attention all seniors and graduate students! Feeling uncertain about life after college?
- The Passing of Dr. Shiva Azadegan
- Live Strategy Competition Finale TODAY
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)