On October 25 at 3 a.m. the steam being supplied by the Power Plant will be shut off to allow for repairs to the piping system. This outage will affect the heating and hot water in the buildings listed below. The repairs are estimated to be completed by noon.
- Health and Counseling Centers at Ward/West
- New Smith Hall
- Linthicum Hall
- Hawkins and Psychology
- Liberal Arts
- University Union
- Burdick Hall
- Residence Tower (hot water only)
Any questions or concerns should be directed to the Work Control Center. The Work Control Center can be reached at 410-704-2481 or workcontrol@towson.edu.