On Monday July 27, 2015 installation of the new sunken gardens will begin. This is the areas on each side of Stephens Hall main entrance. Excavation and construction equipment will be operating in this area. The main entrance will remain open, but one side may be closed off at a time. Construction equipment and material will be staged in Lot #1. If you have questions or concerns please contact the Towson University Work Control Center at 410-704-2481.
Stephens Hall Main Entrance Renovation
About Tyler New
Subscribe
T³ – Search
Categories
- Faculty/Staff (8,072)
- General (17,215)
- Students (15,192)
- Uncategorized (60)